Mount the Launch Monitor
Check the room, then mount the launch monitor on the ceiling above the hitting area.
Check the Room
The ceiling should be 2,700–3,100 mm above the floor and level, and the tee at least 3,000 mm from the screen. Keep the launch monitor away from dust, heaters, air conditioners and vibration.
Mark the Mounting Point
Measure the ceiling height (H) and find the center of the hitting area. Draw a line on the floor perpendicular to the screen, mark a point L mm toward the screen (table below), and transfer that mark to the ceiling.
Offset L for your ceiling height H Ceiling height H (mm) Offset L (mm) 2,700 820 2,750 836 2,800 851 2,850 867 2,900 883 2,950 899 3,000 914 3,050 930 3,100 946 Fix the Ceiling Bracket
Drive a screw through the center of the bracket into the ceiling mark, with the bracket's arrow facing the screen, then secure it with the seven screws. Keep it parallel with the screen and leave the screws slightly loose for now.
Hang the Launch Monitor
Loosen the four screws already on the launch monitor, hang it on the bracket with its arrow pointing at the screen, press it flat against the bracket and tighten the four screws.
Connect Power and Ethernet
Plug in the power adaptor, run the Ethernet cable straight to the PC and turn on the power switch. The red power light comes on and the green network light blinks.
Every measurement depends on the mount: the launch monitor must be level and its arrow must point straight at the screen. Check the level both ways with the Laser Indicator, and run Setup before fully tightening the bracket screws.
More Details in the User GuideStill Need Help?
If VTrackToolkit is running, report it in the app: Support → Report Issue. Logs and diagnostic details are attached automatically.
If VTrackToolkit won't start or the report can't be sent, email us with a photo of the screen:
service@laonpeople.com